+ Minimal Complexity
+ Minimal Cost
+ Minimal Time
= 100% Radiation Shielding with proven Top Quality


Did we spark your interest? You will find a selection of completed project from all areas under References. We will be pleased to send you a collection of technical publications and further information upon request. Do not hesitate to contact us. We will be more than happy to take care of your project!

| 1. After the fence to the adjacent property has been secured, aligned guidance rails are introduced into the construction ground. | ![]() |
| 2. The surface-finished lining panel is positioned between the property line and the guidance rails. | ![]() |
| 3. Lower clamping reinforcement and upper ceiling formwork along with limiting slab are integrated. | ![]() |
| 4. The construction pit is excavated prior to application of the FORSTER SYSTEM LINING. The slab secures the backward railing. | ![]() |
| 5. The FORSTER SYSTEM LINING cuts its way down all by itself. | ![]() |
| 6. In greater excavation depths, the FORSTER SYSTEM LINING can be supported and the wall movement can be controlled. | ![]() |
| 7. Neighbour’s hedge and fence are still without any damages | ![]() |
| 8. Below groundwater level, the FORSTER SYSTEM LINING slides into place using the groundwater as “lubricant”. | ![]() |
| 9. The wall and the fixed lower foundation are impermeably poured with concrete. | ![]() |
| 10. This is how your solution looks like: finished floor slab and boundary wall. The hedge has not been disturbed. | ![]() |

Did we spark your interest? You will find a selection of completed project from all areas under References. We will be pleased to send you a collection of technical publications and further information upon request. Do not hesitate to contact us. We will be more than happy to take care of your project!